Monday 21 January 2013

Hot Water!

Within a few days of working back on the project. I was time to get the water system up and running. The Well pump was plumbed with a float switch in the 500 gallon Storage tank.

Trying to utilize the 10 foot garage ceilings. I decided to build a platform to house the pressure regulator tank above the Hot-water heater.

Now for the first time in our lives, we will have our own Washer and drier. A luxury that we are both excited about. we plumbed in this cool hot/cold water and integrated drain pipe. pretty cool unit.

Here, is the utility bathroom on the garage level.  I have to tell ya, after a number of weeks of having to use a bucket for.... well, you know.  having a flushing toilet is a truly remarkable advancement in technology!

No comments:

Post a Comment